According to the engineer Ahmed Mustafa, head of the new city of Al-Mania, the operation of the city’s drinking water and sanitation system, which includes the drainage networks including the city’s streets and prisons, and the city’s water networks and water and sewage stations, as part of the periodic monitoring of the services provided to citizens.
The head of the new Almnia system ordered the regular cleaning of the drainage networks in the city, and the beginning of the cleaning of the drainage networks in the area of İbni Beytak 3, and the payment for the operation and maintenance supported by the necessary equipment from the vehicles, such as cleaning water and fountains, as well as changing the covers of the floor.
As the head of the system reviewed the maintenance procedures of all water treatment plants in the city, especially the main lifting station No. 1, and carried out the necessary periodic maintenance for all water treatment plant components, and carried out the necessary maintenance to ensure that the citizens receive water of the highest quality.
And in the context of the city, the direction of the engineer Ahmed Mustafa, the company of cleaning in the city, the work and the equipment in various parts of the city, and the emptying of the bins.
And in the same context, engineer Ahmed Mustafa, inspect the cleaning station and monitor all the stations and stages of the station, and check the periodic operation schedule and the stages of the lamps, as well as inspect the electricity booth to ensure the safety of the electricity sources, and run the generators and load the station completely on the generators to test it.
And follow the president of the new Almnia plant, the work of injecting the drugs and the special actions of the drainage, the company must follow the correct system in the process of processing the filter and intensify the work, and follow the system of monitoring the quality of the water inside the work.
Then the head of the machine ran over to the water intake and checked the line of the package and took care of the special maintenance along the line.
Then check the head of the machine, the main drainage station number 1, and follow the operation process from inside the altambar, and turn on all the altambats to ensure the safety of all the work and the necessity to check all the compartments and ensure the safety of the exit doors.
Then the head of the device paid attention to the station number 2, and put the generators to work and made several observations, indicating that these observations must be completed within 12 hours, responsible for following up on the compensation of the observations and accounting for the defaulters.
As the head of the machine checked the station only number 3, and took some special precautions for the main engine and maintenance of the external filter to maintain the safety of the internal lights.
إم اختتم جولته بالمرور على شبك كهرباء الحي تيريسي والمتعميز, مشدداً على على على تعليقة جميع تعريفة الشبك