نقلة قطيمة للنقل المصري.. نيرك تتلقة تعريفة وتتعدة وطل فولون تركين المحمول

Ahmed Al-Mufti, the head of the Egyptian Railway Company, said, “The operation of the factory of the Egyptian National Railway Company will begin in July 2025, which is the beginning of the new era of “Sinna in Egypt” in the world of railways and railways.

He added that the first Egyptian metro car to be manufactured will leave the factory in August 2025, according to the timetable approved by the Railway Authority, but the first completed train is scheduled to leave in July 2026.

This statement came during the visit of the Prime Minister, Dr. Mustafa Madbouly, to the kidney factory, and he was accompanied by a number of officials, and was welcomed by the engineer Karim Sami Saad and Dr. Ahmed Fikri Abd al-Wahhab.

وشدد مدبولي على إن هذا بوستيه هلم جدً لمسر because it supports the modern transportation industry, and it achieves the state’s goal of providing sustainable civil transportation links between governorates and centers effectively.

stages of manufacturing and progress on earth

During the visit, “Al-Mufti” presented the details of the project implementation, confirming that:

  • The factory has an area of ​​100,000 square meters
  • Production capacity: 120 عربة سنويًا
  • 80% of the construction work has been completed, and will end on June 30, 2025
  • All production equipment was contracted, which is scheduled to be installed in July 2025

نیرک supports local manufacturing strongly

One of the most important goals of the company is to deepen the local component in the train industry, and the company focuses on:

  • support local suppliers
  • Development of the aid chain in Egypt
  • جلب تنکلوگو من الشركة الدولينين
  • manufacturing and assembly of basic components for cars and trucks in Egypt

Among the most prominent projects you are working on:

40 وحدة قطر مترو (320 عربة) للختين الثاني والثالث
local component: 30%

21 units of the metro train (189 Arabs) for the Alexandria metro project
local component percentage: 35%

500 Arab cars
local component percentage: 70%

نيرك تحقيقة حلم المصر في تعريفة الثقيل

This project is not limited to the manufacture of trains only, but includes the realization of a large Egyptian boom in the country’s railway industry, the provision of employment opportunities, the reduction of dependence on imports, and the transformation of Egypt into a regional industrial center that serves the entire region.

Source link

Comments

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *